On 7/28/2012 7:13 AM, Rita wrote:
Lets say we have 5 jobs,

Job  A  A.condor

Job  B  B.condor

Job  C  C.condor

Job  D  D.condor

Job  E  E.condor

Is it possible to have the entire dag fail if Job C (or whichever) fails? BTW, these are all independent jobs.

I think the textbook setup is to have a Job X that does nothing much and then add PARENT Job CHILD X for each of your jobs. Then X will fail if any of them fails.

Dimitri