[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [Condor-users] Cluster Job latency



Erik Paulson wrote:

> JOB_START_DELAY:
> 
> http://www.cs.wisc.edu/condor/manual/v6.9.4/3_3Configuration.html#13671

Thanks, it works :)
Another little question : I can't find a way to reduce the time taken by 
the first job of a dag, usually 5 minutes. I've set the SCHEDD_INTERVAL 
to 15 (the minimum value, I believe), and anyway when a dag job ends the 
next one is started immediately. But the first job still almost always 
takes 5 mn to start. For now I just don't take that delay into account 
when testing the system as I believe it's a configuration problem, but 
it would be nice to reduce this latency time.

-- 
Matthieu Cargnelli
EADS Innovation Works
IW-SE-AM
Campus Engineering
18, Rue Marius Terce
BP 13050
31025 Toulouse Cedex 03
Tel : +33 5 61 16 88 36
Fax : +33 5 61 16 88 05