[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [Condor-users] Job run time limit ?



Alain Roy wrote:

> Condor 6.7 can deal with this much better than Condor 6.6 if your job is in the vanilla or Java universes:
> you can set it up so that a temporary network outage doesn't cause the job to stop, but will only cause a
> failure if the outage lasts longer than a certain time that you specify.


How exactly does one set this? A quick trawl through the 6.7 manual didn't prove very fruitful, so a pointer to the relevant entry would be much appreciated.

Cheers,
Mark