[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[HTCondor-users] Cancelling condor_off?



Hi,

anticipating cooling constraints, I issued `condor_off -peaceful -startd` an a bunch of nodes a couple of days back.

Now, the cooling constraints were not as severe as feared and the nodes were left running but the startd subslots are obviously still in the state 'Claimed/Retiring'.

Is there a way to cancel condor_off or do I have to wait for all jobs to finish/the nodes to drain and issue `condor_on -startd` individually when done?

The problem with that approach is, that some users' jobs are running for a long time, sometimes even weeks and short of running condor_on via cron or monitoring condor_status when a node drops off it, we may simply miss the time to issue the command.

Cheers and thanks a lot in advance

Carsten
--
Dr. Carsten Aulbert, Max Planck Institute for Gravitational Physics,
CallinstraÃe 38, 30167 Hannover, Germany, Phone +49 511 762 17185

Attachment: smime.p7s
Description: S/MIME Cryptographic Signature